Title Demand Connection Code
Acronym ENTSO-E DCC
Document Type Standard
Committee ENSTSO-E
Published Year 2016
Link https://www.entsoe.eu/network_codes/dcc/
Abstract

The Demand Connection Code sets harmonised requirements for connecting large renewable energy production plants as well as demand response facilities. The code will ease the integration of 260 gigawatts of photovoltaic & wind (almost tripling the current installed capacity in Europe) as well as 11 gigawatts of demand response in Europe (which could mean the sparing of 11 coal generation plants).